1. Start with the production record
SCADA telemetry becomes production events for every settlement period, with lossless retention behind it. Nothing is re-keyed.
Feature · Royalty Settlement
Bring production, contract terms, CPI adjustments, curtailment, approval, and payment into one settlement process that your team can review and explain.
She lives on a fixed income. When the check doesn't come on time, there's no cushion behind it. Somewhere, an analyst takes that call live and has to rebuild an entire month's math before she can answer it. One unexpected number, and the whole room reorganizes around it. Whatever wasn't urgent an hour ago slides to the bottom of the pile. Because the same bad math also lands on her tax form at year-end. One wrong circle, and it isn't just her check anymore.
On Flux Energy, she doesn't rebuild the month. She just asks it. The exact question she couldn't answer on the phone, answered before she even hangs up. CPI where the contract calls for it. Flat where it doesn't. Never confused, never late. One correct number. Every filing it touches, correct with it.
She checks the mailbox every week. The month, meanwhile, is already being counted, whether she's watching or not. The wind blew. The price was low. One tag, and every filing downstream of it, including the 1099, knows the same thing. Fourteen columns, assembled, not reconstructed. She reviews. She doesn't rebuild. One release. One approval. The check and the 1099 are correct together, not one fixed and the other forgotten.
Then it moves the same day, every month, without anyone chasing it or letting anything else fall behind. The exact difference she noticed sits right there in her own portal, explained, not defended. Right on time, this time, and the number on her tax form will match it too. Flux Energy. The check that explains itself.
The problem
How it works
SCADA telemetry becomes production events for every settlement period, with lossless retention behind it. Nothing is re-keyed.
Gross revenue → base royalty → CPI adjustment → REC share → curtailment deduction → net payment. Every component visible in the 14-column settlement breakdown.
Escalated and flat contracts run side by side without confusion. The CPI escalation engine applies the index multiplier only to contracts that carry the clause. Holds and variance review sit on top.
Dual control above threshold, GL accrual in balanced double-entry, ACH or Stripe Connect disbursement, and 1099 figures compiled from what was actually paid.
What you get
Landowners see production, CPI detail, curtailment, and payment history by parcel and period.
Every figure traces to its inputs. Defensible under audit, not reconstructed from a spreadsheet.
The payment, the ledger entry, and the tax form inherit the same figure from the same run.
The 30-second version
When a wind turbine generates power, the landowner who leases that land gets paid a share. But the exact amount depends on a lot of variables, including energy price, a cost-of-living adjustment, and any power that had to be curtailed. Most companies calculate that by hand, every month. One mistake and the check is wrong, and so is the tax form.
In Flux Energy, the calculation runs automatically, in a fixed sequence. You can see every step. A second person approves it. Then it posts to the books and the payment goes out the same day, every month. The landowner can log in and see exactly why their check is what it is.
That's royalty settlement with Flux Energy.
Where this connects
Battery and capacity settlements auto-post into the same money path this page describes.
The thread a lender pulls from a P50 runs back through these fourteen columns to the sensor.
The counterparty side of the same record covers production transparency, payment history, and CPI detail.
Questions
It settles at its contract rate with no escalation. CPI adjustment is applied per contract, only where the clause exists. A flat-rate contract and an escalated one can sit in the same run without affecting each other.
Curtailment events are recorded against the period they occurred in and appear as their own column in the settlement breakdown. The landowner portal shows the deduction alongside production and CPI detail.
Batches above a configured threshold require a second approver before funds move. The threshold and the approvers are set per tenant.
Yes. The settlement sandbox runs what-if computations without posting, and holds keep a period from releasing until variances are resolved.
From disbursement history, based on what was actually paid, not from a separate spreadsheet. The same figure that posted to the ledger is the one compiled onto the form.
Explore
Compare met mast and LiDAR data across layouts, then carry the selected resource case into financing.
Read morePlan wind and storage together, account for battery wear, and carry dispatch into settlement.
Read moreHourly prices from every ISO, recurring constraint windows learned from your own history, bids and trades posted to one ledger.
Read moreBuild SAM-aligned P50/P90 models and trace key figures to the operating records behind them.
Read moreSchedule the curtailment, capture the cost, and use the event in settlement and compliance.
Read moreYou’ll work directly with the people building Flux Energy. We’ll model the royalty terms, CPI treatment, and review steps your team handles today.